Define priorities, existing conditions, connected services and decision deadlines before demolition begins.
Separate needs from preferences
List required repairs, functional changes and appearance upgrades separately. This helps protect the essential scope when budget or timing decisions are needed later.
Check connected systems
A new kitchen, bathroom, ceiling or room layout can affect plumbing, electrical, cooling, ventilation and low-voltage services. Review these connections before surfaces are closed or finishes are ordered.
Lock key selections early
Flooring, sanitary fixtures, lighting, doors, hardware and joinery can affect dimensions and sequencing. Identify long-lead selections and decision dates before they delay connected work.
The Gramercy team can review the scope and recommend a practical next step.
Request a quote